Table 5

 

Basic Characteristics of Pumps, Type ЦНС

 

 

 

 

 

 

 

 

 

 

Pump type

Delivery,

Suction,

Number

Power require-

 

Efficiency,

Mass,

m3/h

m

of stages

ment, kW

 

%

kg

 

 

 

 

 

 

 

 

 

 

ЦНС 180-950

180

950

8

710

 

70

4080

 

 

 

 

 

 

 

 

ЦНС 180-1185

180

1185

10

880

 

70

4450

 

 

 

 

 

 

 

 

ЦНС 180-1422

180

1422

12

1060

 

70

4810

 

 

 

 

 

 

 

 

ЦНС 180-1660

180

1660

14

1230

 

70

5210

 

 

 

 

 

 

 

 

ЦНС 180-1900

180

1900

16

1420

 

70

5570

 

 

 

 

 

 

 

 

ЦНС 180-1400

500

1400

6

2460

 

80

5700

 

 

 

 

 

 

 

 

ЦНС 180-1850

500

1650

7

2900

 

80

6000

 

 

 

 

 

 

 

 

 

500

1900

8

3340

 

80

6300

 

 

 

 

 

 

 

 

 

 

 

Table 6

Delivery and Injection Pressure of Pumps

 

 

 

 

Type of pump at group pumping station

Injection pressure, MPa

Delivery, m3/h

8НД-10х5

4 to

6

150 to 300

 

 

 

 

АЯП-3-150x600

4 to

6

150 to 300

 

 

 

 

5МС-7x10

10 to

12

150

 

 

 

 

9Ц-12

15

 

160

 

 

 

 

ЦН-150x150

15

 

150

 

 

 

 

ЦН-150x200

20

 

150

 

 

 

 

7. WATER DISTRIBUTING POINTS

According to their technical outfitting, water distributing points (WDP) are similar to pressure pipe header blocks; additional elements comprise the WDP heating equipment and I&ACS. In contrast to the pressure pipe header block, the WDP is located at a considerable distance from the BGPS and closer to the zone of concentrated location of a group of injection wells. In this case, the greatest economy in length of high-pressure pipelines is obtained. But even at ordinary arrangement of injection wells, construction of the WDP provides for a reduction of metal consumption, especially at a large number of wells connected to one

41

group pumping station. In other words, it is expedient to construct the WDP under condition of relatively low injectability of the injection wells.

Usually one WDP is connected with four to six injection wells. The WDP room (6x6 or 6x9 m) houses shut-off slide valves and diaphragms with differential pressure gauges for measuring the flow rate of process liquid pumped into each injection well.

The WDP room, which is referred to explosion-hazard class B-16, is equipped with exhaust ventilation for airing the room prior to entry of the attending personnel. Electric heaters provide in winter time the temperature inside the room not below 5 ºC.

Injection wells

The wellhead of an injection well is provided with a standard equipment designed for a maximum pressure expected at injecting the process liquids. The wellhead equipment shall provide for the well sealing, installation of oil-well tubing, and for performance of such processes as injectability restoration, measurement of pressure and well injectability. The most frequently employed is the equipment, type 1АНЛ-60-200 or АН1-65-210 with a flow area of the Christmas-tree of 60 to 65 mm at a working pressure of 20 MPa.

From the group pumping station, water is fed through a flow tee of the wellhead equipment into the oil-well tubing, and a neutral (buffer) liquid is fed through a pip of the flow cross into the annular space.

The parameters of oil-well tubing for injection wells shall be selected based on conditions of mechanical strength and permissible losses of head upon injecting the process liquid. The flow rate of process liquid being pumped into the injection well is regulated with a gate valve, such as type 1УР-50, with a nominal diameter of 50 mm designed for automatic regulation of flow rate within the limits from 50 to 1600 m3/day at a working pressure of up to 21 MPa.

42

For measuring the flow rate, different types of flow meters may be used. So, the flow meter designed by Institute Giprotyumenneftegaz comprises a

РШ-4 ball-type transducer and a flow integrator, type ИТЖ-1 or ИРЖ-2.

Technical characteristics of the РШ-4 flow rate transducer mounted

on the wellhead are as follows:

 

 

Operating pressure, MPa ……………………………………

16

 

Flow rate measuring range, m3/day …………………………

240 to

12,000

Nominal diameter, mm ………………………………………

100

 

Temperature, ºC:

 

 

Measured water flow………………………………………….. 5 to 40

 

Air …………………………………………………………… –50 to

+50

Overall dimensions, mm …………………………………….

340x345x265

Mass, kg ……………………………………………………… 47 Permissible content of mechanical admixture, g/l……………. 40 Permissible size of particles of mechanical admixtures, mm … 8

43

Учебное издание

И.Р. Юшков, В.Д. Гребнев

I.R. Yushkov, V.D. Grebnev

ОРГАНИЗАЦИЯ ЗАКАЧКИ ВОДЫ. СИСТЕМА ПОДДЕРЖАНИЯ ПЛАСТОВОГО ДАВЛЕНИЯ

ТECHNICAL FLOODING.

MAINTAINING FORMATION

PRESSURE

Учебное пособие

2-е издание, стереотипное

Подписано в печать 18.10.2021. Тираж 53 экз. Усл. печ. л. 2,75. Формат 60×90/16. Заказ № 227/2021.

Издательство Пермского национального исследовательского политехнического университета 614990, г. Пермь, Комсомольский пр., 29, к. 113.

Тел.: (342) 219-80-33

Соседние файлы в папке книги